Water Supply in St. Katherine  and Wastewater Management in El Tur

Financing Agency: Europe Aid

Project Period: 08/2006 – 07/2010

 Water Supply St Katherine

  • Water long distance transmission main (110 km) with 4.000 m³/d, altitude differences of 1,600 m,
  • 8 booster pumping stations with 50 bar design pressure (hydrostatic pressure 35 bar)
  • 7 reservoirs (4 x 2.000m³ + 2 x 1.000m³ + 1 x 300m³
Wastewater System El Tur
  • Lengths of Gravity Network: 12 km (DN 200 – DN 400)
  • Lengths of Pumping Mains: 15.5 km (DN 300 – 600)
  • 5 new PS + 4 PS for rehabilitation
  • (20 l/s – 811 l/s)


 





 

 

 

 

 

 

WWTP El Tur

  • Oxidation Ponds / Lagoons (Anaerobic, Facultative, Maturation)
  • Phase I: 2.500 m³/day for 6,000 P.E. - design horizon 2012
  • Phase II: 7.000m³/day for 20,000 P.E.- design horizon 2022