Attention: open in a new window. Print

Alexandria

Arab Republic of Egypt

Wastewater System Alexandria, Amriya District

Financing Agency: KfW Development Bank

Project Period: 07/2000 – ongoing

Services Provided:

  • preparation of the necessary soil and land surveys, taking samples as required and performing the necessary laboratory analyses and other investigations,
  • review of the estimated numbers in the previous studies,
  • studying the utility management, developing a program to strengthen assets in the water sector,
  • critical analyses of the performance of the operator and development of training program including training in Germany,
  • preparing of preliminary design,
  • preparation of detailed design for the agreed sewerage system and WWTP
  • preparation of Tender Documents acc. to FIDIC Conditions of Contract (Yellow Book), considering a 60 months operation of the WTTP,
  • environmental impact assessment,
  • sludge and wastewater reuse and application,
  • assistance in tendering, evaluation of offers and assistance in awarding the contract

Ongoing:

  • construction supervision as FIDIC Engineer for:
    • Sewerage System
    • WWTP
  • Studying and preparation of the Variation Orders for all the additional work requested by the Employer
  • Assistance in the commissioning of the works